Overview:
The project consisted of altering an existing electronics lab space to house electronics research and testing operations. The work included demolition, concrete & masonry, structural steel, UL rated floor deck assemblies to support HVAC equipment, interior finishes, sprinkler, and extensive mechanical & electrical.
SBD secured various electronic/testing equipment. The installation of the equipment was coordinated with our construction activities.
The project was extremely challenging due to an aggressive schedule and numerous major design changes.
Project Details:
Architect | Marshall Craft Associates, Inc. |
Size | 6,000 sf |
Cost | $696,485 |