Overview:
Objective of the project was to replace an existing retaining wall at the Greenspring Professional Building. Wall was approximately 130 feet long x 7′ tall. Existing wall consisted of preformed concrete panels which were becoming unstable and posed a danger to vehicles parked in front of the wall. The existing wall was demolished and replaced with an interlocking modular stone wall. Project involved significant excavation, underground drainage, and asphalt repairs to two parking lots. An old wood fence was replaced with a new aluminum picket fence incorporated into the construction of the wall itself.
Project Details:
Engineer | Geo-Technology Associates, Inc. |
Cost | $140,691 |